A timber hull can last a very long time, but rot, borer and old caulking catch up with it. Fixing it is shipwright's work: new ribs, new planks and recaulking the seams. The steel and aluminium hull pages cover the other materials.
In this video I talk to Justin, the shipwright leading the rebuild of a timber trawler. The ribs had decayed to compost, so they replaced 115 of them and about a quarter of the planks, repaired many more, and found borer damage in the keel and stems. The whole hull was recaulked, using about 70 kg of linseed putty, in seven months out of the water. He also explains how long a timber boat can be out of the water: up to two weeks is fine, and the seams that leak will take up again, but push it towards two years and the keel starts to shrink and you have to be more careful.
Steaming new ribs
Justin on the new ribs, from yellow stringybark cut and steamed into the boat within five days. They're laminated, three layers through most of the hull, stepping up to four where it gets tighter and six thinner ones on the tuck of the bilge, glued and nailed, with the joins staggered over four or five planks. They broke a couple at the start, until they took half a mil off each lamination and steamed them longer.
Rot from the fish room
Paul, the naval architect, shows the damage to the shear clamp behind the old clad fish room, where the timber was starved of oxygen for 20 or 30 years.
Caulking and planks on a 1937 yacht
On the hardstand next to us, Susie is repairing her 1937 timber yacht on her own. She hooks the old caulking out with irons she's made on the grinder, and explains that a new plank's butt join should land on a flat, not on the twist.
