Renko is a 9 metre steel trawler, owner-built in about 1990, with a Detroit Diesel 4-71. I bought her on the Lane Cove River in Sydney in January 2019, when she was called Julie Too and was more rust than steel, and brought her up to the Hawkesbury. Over the next few years I restored her: eight months on a hardstand at the oyster farm for the hull, nearly two years on the mooring for the electrics, deck and wheelhouse, and two months on the hardstand in Bundaberg in 2021 for the rest. The engine was rebuilt along the way, which has its own pages. The first video squeezes the whole story into an hour and a half; the rest are the episodes in the order I made them. At the end of it my verdict is that Renko is more of a cautionary tale than an inspiration: you'll put far more into a boat like this than it's worth, so buy one in good condition instead.

Buying her: the boat

I buy the trawler, bring her up the coast to the Hawkesbury and give a tour. Water keeps coming in through the stern gland, the bilge pump and float switch have died, and the engine stalls going into idle. On my mate Rick's advice I take the slack out of the throttle cable, which makes her drivable until I can sort the idle out properly.

Buying her: getting ready for the hardstand

She cost just under US$7,000. With Jeff's help I cut the old tow-post plates off the deck, look at the rust around the deck fittings and go through the tools I'm taking to the hardstand. I also buy phosphoric acid for the rust and measure the prop shaft for new stern gland packing.

The first hardstand: hauling out

She comes out of the water at the marina for the first time. The anodes are gone, there's a hole in the keel next to an anode strap, the rudder flange has corroded and some skin fittings need work. The marina won't let me do much work on steel, so I find a spot at the oyster farm just up the bay for a month.

The first hardstand: boat stands

On a 2 metre tide I run her right up to the shallow seawall at the oyster farm so the crane can lift her out. Then I make my own boat stands from Acrow props, with pivoting heads and timber pads, so I can give the marina's back. I use six where the marina used four.

The first hardstand: doublers and the rudder post

I grind off the doubler plates welded along the sides, and cut into the hull in one spot when I was tired. Then I try to free the seized rudder post with heat, a hydraulic ram and a sledgehammer, with help from Bill, who used to own trawlers. Only the steering arm comes off.

The first hardstand: testing the hull's thickness

Under the stern gland, where salt water had dripped for years, I needle-gun and wire-brush the steel, then measure what's left with an ultrasonic thickness tester. The thinnest point is 3.6mm, so I keep the plate and check it each year. The transom is so pitted it will just be replaced.

The first hardstand: stripping for sandblasting

I needle-gun the paint off the topsides, take out most of the old seacocks and cut out the old sounder housing, which had filled with water. Then I clean the stern tube with phosphoric acid and start getting the cutless bearing out, so the propeller shaft parts can be made.

Hull work: a door in the bulwark

I cut a door in the bulwark beside the wheelhouse with the grinder and oxy, and Dave (Peddles) helps decide which way it should hinge. I square it up, patch the rust along its bottom edge, replace a rotten length of the top rail and cap the rail ends so water can't get in. Then I show the weld-on pintle hinges it will hang on.

Hull work: pad welding, asbestos and a small fire

More pad welding on the pitted hull and keel. Welding sets the cabin joinery smouldering, so I tear out a cupboard that was glued and screwed in. I also remove some asbestos the safe way, weld up the cuts in the fuel tank and make nitrile rubber gaskets for its hatches.

Hull work: finishing the hull

I explain why the old bags of concrete ballast have to come out, patch the hole left by the old wet exhaust and take the timber rubbing strips off the sponsons. A thin, pitted section of sponson is cut out and replaced, I try line heating to pull out the dent at the old transducer mount, and I plug an old pipe hole. Then the burnt paint comes off the transom, ready for primer.

Hull work: a day on the job

A whole working day, from crossing the river in the tinny to a run to the hardware store for imperial stainless bolts. Back at the boat I needle-gun and wet blast the sponson, with Chlor-Rid in the blast water and Hold Blast after it, and take off the exhaust manifold. Then it's back to the shops for more garnet.

Hull work: gearbox seals and a deck crane

I prime the patches where the stands sat, then take the output flange off the gearbox to replace its oil seals, since the oil had emulsified, and measure the new rudder post. Then I work out the slope of the deck with trigonometry, an angle gauge and string, to make a 5 degree wedge for a 12 volt deck crane.

Naming and launch: renaming her Renko

With some of the channel's viewers I hold a denaming ceremony to take Julie Too off Neptune's ledger, put the vinyl name on the transom, then name the boat Renko. After the ceremony I redo the home port properly, level and centred on the name.

Naming and launch: launch day

Pete helps me Sikaflex the deck pinholes to keep the rain out for now, and I weld a wedge base for the deck crane and clean up its winch motor. Leon and Dylan help me rip out old wiring and set up the electrical board and bilge pumps. Then the crane drops Renko in on a low tide, she sits on the mud, and it takes two hours with a Tirfor, the Land Rover and a lot of wading to drag her off so she can be towed to the mooring.

Afloat: sound insulation and a bilge outlet

On the mooring, I put foil-backed sound insulation on the engine hatch and measure up the engine bay for the rest. Then I weld in a bilge pump outlet pipe that comes up through the deck and out the bulwark, well above the waterline, and reroute the solar cable through the engine air intake so the hatch can close.

Afloat: loose ends

A week of finishing half-done jobs: new switches in the dash, the battery monitor set to the right capacity, a hand winch for the tender, a new LPG hose for the stove, and the switch panel labelled with proper terminals. I also treat the rust on the crane base with phosphoric acid and lift the tender with the new winch.

Afloat: the worst of the deck

I cut out the biggest hole in the deck, along with the rusty base of the engine bay coaming, and make a template. Fixing the air compressor's pressure switch gets the plasma cutter going, so I cut the new plate, fit it and tack it in, then bend flat bar for the coaming. More on the methods is in repairing a steel hull.

Afloat: deck pinholes and the generator

I plug pinholes in the deck by welding in rod, clean out the bilge ready for the engine and run the control and sensor cable. The generator's carburettor floods because its float leaks, so I explain how the float works and patch it. Then the seized Morse cables come out of the control.

Afloat: Morse cables and start wiring

The new Morse throttle and gear cables go into the control. Leon sets up the new Victron solar controller, I cut holes in the dash for the gauges, and we measure the starter solenoid drawing 50 amps, so Pete, Leon and I wire it through a second solenoid from a start button.

Afloat: the instrument panel

I keep the raw water cooling in copper, lag the exhaust, use T-bolt clamps on the hoses and fit a raw water flow sensor. The gauges, switches and bilge alarms are wired to the dash, I start mounting a touchscreen PC from Ben, and the engine stop solenoid is wired to its button, getting the Detroit ready to run in the boat.

Awning and wheelhouse: building the awning

I design and TIG-weld an aluminium awning frame to carry three solar panels over the back deck, test-fit its brackets on the wheelhouse roof and pull it square with ropes. Pad eyes go on with stainless rivets, Sikaflex and Duralac, and Dave and Marty help me get it out to the boat.

Awning and wheelhouse: cabin and roof

I epoxy and carpet the wheelhouse floor boards, then clean, rust-convert and paint the cabin bilge below them. The rusty corner of the wheelhouse roof is cut out, and Dave helps me tack in a stainless patch with a hole for a drain. Rope and chain go onto the anchor winch, and the floor and ladder finally go back in.

Awning and wheelhouse: fitting the awning

Dave helps me bolt the awning up. Swaged stays with turnbuckles run to the wheelhouse roof and the mast and down to the bulwarks on pelican hooks, and the solar panels are bedded on Sikaflex. I also fit the new GPS aerial on the old one's mount, and after the survey I finally find someone to insure a steel boat.

Awning and wheelhouse: ceiling, dash and horn

Dad helps me stain the new ceiling boards and the dash trim. I pull wires through the mast, patch the tender, cut down a table to sit on the engine hatch, and get the horn working again (something had nested in it) on a button in the wheelhouse.

Awning and wheelhouse: alignment and a fuel leak

I fine-tune the engine alignment with a dial gauge, then dive to scrape the barnacles off the prop when there's still vibration at high revs. I help Nick find a family ring lost in the river, weld a platform for the fridge, and trace diesel in the oil to a leaking injector fuel pipe before changing the oil. Then I take Renko down to Sydney Harbour to dive on a tunnel.

Awning and wheelhouse: wheelhouse fit-out

Before heading north I cut inspection hatches into the lazarette, whose compartments each hold their own water. In the wheelhouse the old cupboard comes out and a new one I made with Steve goes in, along with sinks in wine barrels on the back deck and homes for the charts and safety gear. I also get a rusty Honda water pump going again.

Awning and wheelhouse: throttle controls and carpet

Pete and I cut and lay new marine carpet in the wheelhouse, and I fit a new throttle and gear control, setting the cable travel for the gearbox and the governor. I also make cable downpipes, a steel frame for the bench over the fridge and a pedestal for the helm seat, and Adrian gives me a lesson on the Detroit.

The second hardstand: week one in Bundaberg

In Bundaberg, next to Damien and Jess's steel trawler Brupeg, I buy steel at the scrapyard, finish a teak table and sandblast a bronze hatch. Once Renko is out of the water, Adam and I plasma cut off the aft part of the port bulwark and a hatch from the cabin into the engine bay, and I cut out the old paddle-wheel log.

The second hardstand: week two

I needle-gun the bulwarks and patch the hole where the paddle wheel was. Damien and I cut the rusty pipe off the tops of the bulwarks, to replace it with stainless pipe from the scrapyard, the bronze hatch goes in with new glass, and the cabin is finished.

The second hardstand: hand rails and cleats

A new sheet of steel goes in as the back-deck bulwark, braced with flat bar. We bend thick-wall stainless pipe into the top rail with a ratchet strap, Damien makes a jig for the uprights between the bulwark and the hand rail, and I make bigger cleats from pipe.

The second hardstand: last of the welding

The last welding before paint: needle-gunning the wheelhouse, burning off the old non-slip, brackets for the toolboxes, a stainless ladder up to the wheelhouse roof that Damien helps me fit, and a cowl vent for the cabin.

The second hardstand: painting

Epoxy primer, topcoat and deck paint go on, after the spots where she sat on her pads are prepared again. I service the Detroit, swap its starter for one Adrian sent and test start it, then fit new window seals, a stainless door frame and an LED anchor light, and the antifoul goes on.

The second hardstand: back in the water

The travel lift puts Renko back in at Burnett Heads after two months on the hardstand. Then we run overnight to Lady Musgrave Island, where I take her in through the reef, metal-detect on the bottom and try a drogue as a sea anchor to cut the roll.

Later: bringing her back

In 2025 Dad wanted his ashes scattered from Renko, so I go over her from stem to stern after a few years of little use: bird mess, rust wherever the steel wasn't blasted, flat batteries, a dead 24 volt bilge pump and the stern gland leaking again. I rewire the battery chargers, fit a Murphy temperature gauge and clean her up before she goes onto the hardstand at Fenwick's.

Later: finishing the deck

I make a new dipstick for the diesel tank and chip the rust on the back deck, treating it with rust converter. Then the deck gets epoxy primer and barrier coat, with single-pack Norglass non-slip paint on top that's easier to touch up. I also trace a fault in the pressure water pump's wiring.